Possible, but separate air conditioning is recommended. The most common is the Eco inverter 5 kW.
Service, installation, handover – all in one place; customer trust and satisfaction.
The Wi-Fi interface allows you to monitor your heat pump even when you are not at home. You can monitor your energy consumption, change the temperature and switch your heat pump on or off as needed. So you can take care of your home even when you’re away from home.
Timing coordination goes through us – we handle all coordination and communication. You only have contact with one person, your commercial officer.
Underfloor heating, heat recovery, heat pump, air conditioning, solar power.
1. Obtaining an estimate for your investment.
2. Making the investment and collecting the documentation for the annexes to the grant application, completing the works and making the payment. 3. Submitting the application to the EcoFund.
4. Receive the co-financing decision after approximately 6 months.
5. Payment of the subsidy within 60 days of notification of the decision.
Submission of documentation for heat pumps can take place at any time during the call period. However, the submission of the documentation for the solar power plant must be made no later than 2 months after installation.
Not if it’s on the floor of a balcony or terrace (only the façade is an issue).
You must have a separate meter and separate heating (e.g. your own gas stove).
It’s the same as air conditioning, i.e. it’s not disturbing.
Sure, it looks like a 5 kW air conditioner.
There is no problem regarding the space in the apartment, the interior unit itself occupies only 0.5 m2. The outdoor unit is most often on a balcony or terrace, but the indoor unit can be placed in a hallway, utility or bathroom.
Preferably, we will inform you of the date 14 days before installation and the day before arrival.
Installation is arranged in 1 day. In rare cases it takes 2 days.
The bank is obliged to transfer the credit facility within 5 days after the customer has provided the relevant evidence. However, the ECO Credit is transferred twice a week, on Tuesdays and Fridays.
1. Obtaining an estimate for your investment.
2. Submitting the application to the EcoFund (we will already pre-fill the application for you).
3. Receive the credit decision and creditworthiness verification forms.
4. Concluding and signing the loan agreement at Intesa Sanpaolo within 60 days at the latest.
5. (Possibility to transfer 40% of the credit amount).
6. Completion of the works and submission of the final documentation to the bank.
7. Payment of the balance (60 %) or the full amount of the credit.
The municipalities with an adopted air quality plan are Celje Municipality, Ljubljana Municipality, Maribor Municipality (agglomeration), Murska Sobota Municipality, Novo Mesto Municipality, Trbovlje Municipality and Zagorje ob Savi Municipality.
The holiday home is classified as a residential building, so the applicant can obtain the incentive under the call for tenders 74SUB-OB19. However, it is essential that the client has a building permit that has been converted into a residential building. A change of use of the building to residential use alone is not sufficient. Even if the building has a house number, it is not necessarily classified as a residential building under the building permit.
The original copy of the signed contract and the other final documentation are conditions for the grant to be paid. The signed contract can be sent at any time after receipt of the decision, but no later than 2 months after the deadline for completing the investment.
The amount of electricity to be taken into account is the difference between the electricity taken and the electricity delivered, which must of course be read at the same metering point. It shall be taken into account in the billing at the end of the calendar year.
In spring, summer and autumn, your solar power plant will produce more electricity than you need for your own needs and will therefore feed the extra electricity into the grid. The grid acts as an energy store, balancing peaks and troughs so there are no interruptions to your electricity supply. This means that if your power plant does not produce enough electricity, you will receive the electricity you need from the grid during periods of lower solar insolation (e.g. winter) and higher consumption.
The electricity you don’t use is returned to the grid or to the supplier, as the solar power plant is designed to be self-sustaining and thus cover your own consumption, so unfortunately you can’t sell it.
You will still pay 2 charges, the RES and CHP contributions, because they are linked to the connected power.
The EcoFund is granting a non-repayable financial incentive (public call 71SUB-SO19) for new investments in solar power plants. The amount of the grant is € 180 per 1 kVA of installed rated electrical capacity of the electricity self-supply installation (for a maximum of 80% of the sum of the connection capacities of the customer sites).
In addition to the charging station, each user gets access to an online platform where they can set charging parameters and monitor charging.
Alternatively, we can add LoadGuard to each charger, which measures the household’s consumption and the solar power generation and adjusts the car’s charging based on this data. The charger also offers several different programmes that you can set up according to your preferences.
1. Consult with our expert to determine the location of the charging station, and later he will explain how to properly prepare the site for the installation of the charging station.
2. Once the site is ready, our experienced installers connect the charger and install the appropriate fuses in your cabinet.
3. The charger is ready for use.
The Etrel charger boasts an aluminium housing and a high protection factor, so it can be placed outdoors.
The charging station can be mounted on a stand or mounted on a wall, but of course it needs to be close to the parking space of your electric car. Before setting up the station, our experts will inspect the site and explain the procedure and give you the relevant instructions.
Charging an electric vehicle increases your household’s energy consumption and consequently your bill. Termoshop recommends a winning combination of a home solar power plant and a charging station, so you can use the energy you produce to charge your vehicle.
There are many different types of connector on the market, basically divided into DC and AC, and single-phase and three-phase. Most cars use a type 2 connector, which is also the standard charging plug for European manufacturers.
You have already taken the first step towards a green future! To ensure hassle-free mobility, Termoshop recommends buying an Etrel electric charger, which boasts the most advanced technology on the market.
For 3 measures you can receive a 50% subsidy (e.g. CHP + AIR CONDITIONING + façade).
You get all products and services in one place, we offer you a personalised solution and a technical solution that’s right for you.
It is best to provide us with the following at the time of enquiry: project documentation (PZI), floor plan, all documentation related to the mechanical installations (what you have). It is also desirable to give a timetable for the construction.
Yes, but not recommended because its effectiveness is reduced.
Of course not, but it is more reliable.
The base is (usually) a heat pump, then underfloor heating, heat recovery, air conditioning and e.g. solar power are added on top. The most common combination for customers in new build is mainly heat pump, underfloor heating and ventilation. Other combinations.
Our heat pumps are on the list for grants from the EcoFund.
No, a heat pump keeps you comfortable and warm.
The volume depends on the placement of the outdoor unit. That’s why we always advise where to place the heat pump when you visit so that it is unobtrusive for you. In particular, make sure you do not place it under balconies, in corners or in “tunnels” between houses.
Most of these houses are heated with Mitsubishi Zubadan outdoor units, which are also suitable for lower outdoor temperatures.
The call is open to natural persons as well as legal entities governed by private law and sole traders.* More detailed information is available in the EcoFund’s call documentation.
When submitting an application, the applicant must have all documentation, including a revised Battery Connection Consent and a validly concluded System Use Agreement. All invoices must have been issued from 1.3.2022 onwards and prior to the submission of the application. A supplement to the application may be submitted to prove facts that have arisen up to the latest date of submission of the application. However, the invoice may be separate.
The subsidy shall be granted for a battery storage device with a storage/recharge capacity (in kWh) of at least 0.7 h of operation of the electricity self-supply device at rated electrical power (in kW). The amount of the non-repayable financial incentive shall be:EUR 500,00 per 1 kW of installed rated electrical capacity of the electricity self-supply installation with battery energy storage, up to a maximum of 25 % of the eligible costs of the investment,
EUR 50,00 for 1 kW of the installed rated electrical capacity of an electricity self-supply installation without a battery energy storage device, up to a maximum of 25 % of the eligible investment costs, for a maximum of 80 % of the sum of the connection capacities of the consumption points. Calculate your own subsidy amount.